• FishFace@piefed.social
      link
      fedilink
      English
      arrow-up
      0
      ·
      2 months ago

      In a functioning system, anyone connecting a large site to the grid would need to sign a contract about how they’ll use power which would include these provisions, and a contract without them would cost far more.