• plinky [he/him]@hexbear.net
    link
    fedilink
    English
    arrow-up
    1
    ·
    21 days ago

    At the data-center scale where air-cooling still dominates, the team estimated that a 1 GW facility using conventional air cooling could require roughly 550 MW of additional power dedicated to cooling infrastructure alone. By contrast, their optimized liquid-cooling approach would reduce that cooling overhead to around 11 MW.

    they are high with these claims, if anything they’ll save some 11MW on the pumps at best