In Utah on Wednesday, State Senate President J. Stuart Adams—one of the most powerful Republicans in the state—lost his primary election after supporting a major data center development near the Great Salt Lake, in one of the clearest signs yet of the growing political risks tied to the industry.

  • 0x0@lemmy.zip
    link
    fedilink
    arrow-up
    1
    arrow-down
    1
    ·
    23 hours ago

    True, but 9 times out of 10 you don’t see the distinction in the comments, it’s only “datacenters”.

    • DevDave@piefed.social
      link
      fedilink
      English
      arrow-up
      2
      ·
      23 hours ago

      I do feel bad for the “normal” companies that are general purpose data center and colo providers that are basically doomed to never being able to expand because of this shit show.

      AI facilities should be rebranded as “slop farms” or “slop pens”. I think it would be pretty easy to isolate them as a normal facility might top out in the 1-2 megawatt neighborhood while a slop farm is going to need that just for the pumps and exchange fans for its cooling system. Just rough numbers but the two have extremely different requests to operate power requirements.